• Solar Parks with 54 MWp DC Capacity and BESS - CEE
Operational solar parks in CEE, >50 MWp, ongoing BESS development and stable PPA-backed revenues.
• Hybrid Renewable Energy Park: Solar + Wind + BESS + Agri-PV - Montenegro (up to €248 M)
One of the largest hybrid renewable energy portfolios currently progressing in Montenegro.
Expected annual renewable electricity production: over 410 GWh
Project company available for partial or full acquisition.
• Energy Park, part of AI Data Centre Platform - Paks, Hungary (up to €1 B)
The hyperscale AI Data Centre Platform can be split into seperate projects: Energy Park and Data Centre.
Green solar Agri-PV energy plant ~730 MWp + BESS (battery energy storage system) ~2.6 GWh preliminary.
Project company available for acquisition, site plots options secured, 730 ha Agri-PV land contractually secured (30+20 years).
• Ready-to-build 5.93 MWp solar project with a validated grid connection - Capua, Italy
Ready-to-build utility-scale solar project with 5.93 MWp installed capacity and expected annual generation of approximately 10.7 GWh.
Fully permitted, project SPV ready for acquisition.
• 9.99 MWp industrial-site solar project - Latina, Italy
Industrial-site PV project with 9.99 MWp of installed capacity on 11.22 hectares of suitable land.
Authorisation obtained, connection offer accepted, final-grid connection design approved.
• 11.08 MWp solar PV project - Sezze, Italy
11.08 MWp tracker-based solar project on 13 hectares of industrial land, with forecast annual generation of approximately 18.5 GWh.
PAS and environmental screening completed; accepted medium-voltage connection to CP Latina Scalo.
• Utility-scale PV project with an integrated battery energy storage system (BESS) - Riesi, Italy
Advanced solar-plus-storage project combining 10.88 MW of PV capacity with 8.82 MW of integrated BESS capacity.
Positive PAS determination obtained; connection offer accepted for a dedicated 150/36 kV Terna substation, with approval in progress.